News
    Newsletter

Raschka Engineering Ltd
Address: Panoramastrasse 40
CH-6373 Ennetbürgen, Switzerland
Tel:
+41 79 750 9845
E-mail: info@raschka-eng.com 

Raschka Engineering Ltd – Winterthur Office
Address: Neustadtgasse 1A
CH-8400 Winterthur, Switzerland
Tel: +41 76 830 1995 

E-mail: info@raschka-eng.com 

Raschka Guangzhou Engineering & Technology Co., Ltd.
Address: 
Room 40101, 3th Building, No. 1 Qinghui Middle Road, Nansha District, Guangzhou, China
15 Floor, North Tower, Peace Business Centre, No. 880 of Guangzhou Avenue South, 510305, Guangzhou, China
Tel: +86 (0) 20 8966 4189
Fax: +86 (0) 20 8966 4278
E-mail: info@raschka-eng.com
Website: www.raschka-engineering.com

Raschka Representative Tianjin, China
Add: 809, Jinxing Plaza, No. 65 of Xiqing Road, Tianjin, China
Tel: +86 (0) 22 2292 7887

Raschka Representative Wuxi, China
Add: 18-1, Fengyang Road, Huishan Economic Development District, Wuxi, China
Tel: +86 (0) 510-8331 2868

Raschka Representative Beijing, China
Add: Room 7, No.9 Building, Tongtian Yuan, Changping District, Beijing, China
Tel: +86 (0) 10-8482 0795

Raschka Representative Singapore / S.E.A
Novexx Engineering Pte Ltd

Add: 8 Tuas View Loop, Singapore 637674
Tel: +65 6896 6620
Website: www.novexx.com.sg  

Raschka Representative Brazil
BIOCAL Burntech

Add: Rua Pitangueira, 865, Bairro Siegel, Agrolândia,Santa Catarina – CEP: 88.420-000
Tel+55 47 3534 5400

E-mail: contato@biocal.ind.br
Website:
 
www.biocal.ind.br

Hazardous Waste Incineration Facility for Changqing Agrochemical Group, Yangzhou, Jiangsu, China

Guangzhou/Liestal, 08.03.2015Project award was given to Raschka Engineering after several intensive rounds of discussions with client and decision was finally made on the basis of a convincing process solution. The client has appointed Raschka Engineering with the delivery of an entire waste incineration project on EPC basis which shall be capable to handle all hazardous waste streams and effluents coming from the clients manufacturing process. Fuel type includes: liquid waste, solid waste, polymer, sludge, pasty waste and waste water and most of them containing high levels of salt. The planned start up is scheduled for Q2 2016.